Storm Damage

Storm Damage Reinstatement — Buckinghamshire

Storm Eunice roof and internal reinstatement for a 1930s High Wycombe cottage — from emergency tarping through scaffolding, drying, and decorative finish.

£0
Claim Value
0
Duration
0
Trades

The Full Picture

The Challenge

When Storm Eunice Took the Roof

Named storm winds tore tiles from the rear pitch of this 1930s High Wycombe cottage, opened the roof covering, and drove rain into the loft and first-floor bedrooms. Ceilings sagged, plaster failed, and water tracked into the landing and bathroom.

The owners needed the building made weathertight overnight, a clear structural view for their insurer, and a reinstatement programme that would not leave the cottage open to further weather for weeks.

Our Approach

Seal the Envelope. Then Rebuild.

Emergency tarping secured the roof the same day. A structural survey confirmed the extent of rafter and ceiling damage, and scaffolding was programmed immediately so permanent roof works could follow without delay.

Internal drying, plaster repairs, and decoration ran in parallel once the envelope was closed. Our project lead coordinated six trades across an eight-week programme, returning the homeowners to a dry, fully reinstated home with insurer documentation complete.

Project Timeline

Every phase managed, documented, and delivered on schedule.

Phase 01
Emergency Tarping
Roof made weathertight the same day with professional tarping to stop further water ingress into the cottage.
Phase 02
Structural Survey
Full inspection of rafters, roof covering, and water-affected ceilings, with a clear schedule agreed with the insurer.
Phase 03
Scaffolding & Roof Works
Scaffold erected, damaged covering stripped, and permanent roof reinstatement completed to match the existing pitch.
Phase 04
Internal Drying
Targeted drying of loft, bedrooms, and landing with moisture readings logged until surfaces were ready for finish works.
Phase 05
Plaster & Decoration
Failed ceilings and plaster made good, then full decoration to restore rooms to pre-storm condition.
Phase 06
Sign-Off
Final inspection, snagging, and formal sign-off with the homeowners and insurer documentation complete.

Project Details

Location
High Wycombe, Buckinghamshire
Property Type
1930s Cottage
Claim Value
£62,000
Project Duration
8 Weeks
★★★★★

"After the storm we thought the cottage would be open for months. Capital Services tarped the roof that evening and kept everything moving. Eight weeks later it was watertight, decorated, and finished — we could not have asked for more."

Client from High Wycombe

Homeowner

Experienced Storm Damage?

Our emergency response team is available around the clock — from tarping and make-safe to full roof and internal reinstatement.